
IDF / MDF
Dressed plant · access live
Short patch · mixed colors
Jun 2026 — Oct 2026 · New York, NY · On-site
Supported enterprise network operations, OT camera deployments, and multi-site LAN refresh across Catalyst access and core, IDF/MDF buildouts, and the physical plant under them.
- Refreshed LAN on Cisco Catalyst 2960, 9200, 9300, and 9500 — IDF and MDF buildouts, Cat5e/Cat6/Cat6a, BOMs, and rack elevation plans.
- Racked and stacked network gear and OT camera systems, and wrote cabling runbooks for camera and OT integration.
- Ran UPS assessments, battery replacements, and power validation; root-caused UPS load, access control, and OT connectivity.
- Reviewed multi-tenancy, site-to-site IPsec, and ISE/NAC policy with TACACS+; completed ISE onboarding and JAMF endpoint testing.
- Assigned voice VLANs, validated PoE, and confirmed IP telephony on Cisco switches.
- Handled day-to-day operations with MSPs (Xalient, Yorktel): incidents, site surveys, and hardware readiness.
- Catalyst 9200/9300/9500
- Cisco ISE
- IPsec
- OT cameras
- UPS / power
- JAMF
- VoIP / PoE

